CED Warehouse

14,618 sq. ft. metal building includes a warehouse, offices, restrooms, and a mezzanine with a mechanical room and storage. Site work includes fencing with gates, parking, concrete walks, a loading dock, and landscaping. A hangar and taxiway are planned for future development.

Project Photos as of July 2025

Cowboy Church

The facility includes a 4,380 sq. ft. sanctuary with seating for 275, a stage, sound booth, and storage areas. The sanctuary has been remodeled to feature larger restrooms and open space. Parking is available, including designated overflow areas.

Project Photos

Dixon Golf Office Warehouse

A new 10,000 sq. ft. facility for Dixon Golf includes office space (500 sq. ft.), production/manufacturing (3,500 sq. ft.), and warehouse use (6,000 sq. ft.), along with a reception area, conference room, kitchen, ADA restrooms, and a fire riser room. Site work includes new asphalt parking, canopies, a dumpster enclosure, concrete apron, landscaping, H/C ramp, and sidewalks. The west lot is reserved for future expansion.

Project Photos

Pictures as of June 2026

Pictures as of July 2025

Andrew’s Plumbing

This site will serve as the new headquarters for Andrew’s Refrigeration in Phoenix, Arizona. The project includes a 15,000 SF office with 17,500 SF of warehousing, a 6,000 SF auto repair facility, a 5,000 SF HVAC fabrication/storage building, and a 600 SF chiller building. The site will support company operations with truck wash bays, storage areas, and vehicle parking, all enclosed by an 8-foot masonry screen wall. Buildings will be prefabricated metal with natural lighting via clearstory windows.

Project Photos as of July 2025